Projects

One Avighna Park at Parel, Mumbai

Developed by Avighna India Ltd., One Avighna Park is a twin 64-storey luxury residential tower located in Parel, Mumbai. As a trusted partner of Avighna India Ltd., HDG Pipe Hangers with EPDM lining were one of the major supplies for this project.

One Avighna Park at Parel, Mumbai

Developed by Avighna India Ltd., One Avighna Park is a twin 64-storey luxury residential tower located in Parel, Mumbai. As a trusted partner of Avighna India Ltd., HDG Pipe Hangers with EPDM lining were one of the major supplies for this project.

Share Your Requirement

Alpine at Kandivali East, Mumbai

Being developed by SD Corp-a a joint venture between Shapoorji Pallonji and the Dilip Thacker Group, Alpine is one of the tallest residential towers in the suburbs, a 63-storey residential twin tower with homes designed for maximum living space. As a preferred partner for N18 Sanitation, who are the contractors for this project, one of the major supplies from Tembo Global was HDG Pipe Hanger & Sprinkler Hanger with EPDM Lining.

Alpine at Kandivali East, Mumbai

Being developed by SD Corp-a a joint venture between Shapoorji Pallonji and the Dilip Thacker Group, Alpine is one of the tallest residential towers in the suburbs, a 63-storey residential twin tower with homes designed for maximum living space. As a preferred partner for N18 Sanitation, who are the contractors for this project, one of the major supplies from Tembo Global was HDG Pipe Hanger & Sprinkler Hanger with EPDM Lining.

Share Your Requirement

Central Business District Egypt

Egypt’s Minister of Housing, Assem El-Gazzar, said that 49 floors of the iconic tower in the Central Business District (CBD) in the New Administrative Capital have been constructed so far. The iconic tower, set to be the tallest in Africa at about 400 metres, currently stands at 240 metres high, El-Gazzar said in a statement on Thursday. The CBD project, which includes 20 towers, is being constructed in collaboration with the Ministry of Housing’s New Urban Communities Authority (NUCA) and China State Construction Engineering Corporation (CSCEC) with an estimated investment of $3 billion.

Central Business District Egypt

Egypt’s Minister of Housing, Assem El-Gazzar, said that 49 floors of the iconic tower in the Central Business District (CBD) in the New Administrative Capital have been constructed so far. The iconic tower, set to be the tallest in Africa at about 400 metres, currently stands at 240 metres high, El-Gazzar said in a statement on Thursday. The CBD project, which includes 20 towers, is being constructed in collaboration with the Ministry of Housing’s New Urban Communities Authority (NUCA) and China State Construction Engineering Corporation (CSCEC) with an estimated investment of $3 billion.

Share Your Requirement

Al Thumama Stadium

The Al Thumama Stadium is one of seven stadiums that were built for the FIFA World Cup Qatar 2022. It is located near Hamad International Airport. A joint venture between Al Jaber Engineering of Qatar and Tekfen Construction of Turkey is significantly involved in the construction work. The architectural design, by the Chief Architect of the Arab Engineering Bureau, Ibrahim Jaidah, takes its inspiration from the traditional taqiyah hat, a traditional cap which is worn by men and boys across the middle east. A 50,000 m2 (540,000 sq ft) public park will surround the stadium.[3] The stadium has a capacity of 40,000 seats. Its completion is expected in 2021.

Al Thumama Stadium

The Al Thumama Stadium is one of seven stadiums that were built for the FIFA World Cup Qatar 2022. It is located near Hamad International Airport. A joint venture between Al Jaber Engineering of Qatar and Tekfen Construction of Turkey is significantly involved in the construction work. The architectural design, by the Chief Architect of the Arab Engineering Bureau, Ibrahim Jaidah, takes its inspiration from the traditional taqiyah hat, a traditional cap which is worn by men and boys across the middle east. A 50,000 m2 (540,000 sq ft) public park will surround the stadium.[3] The stadium has a capacity of 40,000 seats. Its completion is expected in 2021.

Share Your Requirement

NWIS ( New Water Injection South - R Project )

ONGC has awarded LTHE (Larsen & Toubro Hydrocarbon Engineering) two EPCIC contracts for a new water injection platform (NWIS) in the Mumbai High South field and the Heera Phase III development in offshore India. The NWIS project includes one eight-legged water injection process platform which will be bridge-connected to the existing WIS platform, a 100-man living quarters, modification and interconnection of all utilities with existing WIS, BHS, and SLQ platforms. The NWIS, with a topside weight of 10,000 tonnes, is designed to process raw seawater for injection back into the reservoir. ONGC has awarded Larsen & Toubro Hydrocarbon Engineering an EPICC contract for a new water injection platform (NWIS) in the Mumbai High South field.

NWIS ( New Water Injection South - R Project )

ONGC has awarded LTHE (Larsen & Toubro Hydrocarbon Engineering) two EPCIC contracts for a new water injection platform (NWIS) in the Mumbai High South field and the Heera Phase III development in offshore India. The NWIS project includes one eight-legged water injection process platform which will be bridge-connected to the existing WIS platform, a 100-man living quarters, modification and interconnection of all utilities with existing WIS, BHS, and SLQ platforms. The NWIS, with a topside weight of 10,000 tonnes, is designed to process raw seawater for injection back into the reservoir. ONGC has awarded Larsen & Toubro Hydrocarbon Engineering an EPICC contract for a new water injection platform (NWIS) in the Mumbai High South field.

Share Your Requirement

Heera Redevelopment Project, Phase III at Offshore India

ONGC has awarded Larsen & Toubro Hydrocarbon Engineering an EPICC contract for the 3rd Phase of the Heera Redevelopment project in offshore India. LTHE submitted the lowest bid of USD 187.9 million. The project covers two 12-slot wellhead platforms, approximately 49 km of subsea rigid pipelines. 10 riser installation and modification work at seven existing platforms and the Heera process complex. As a trusted associate of LTHE, we have supplied all the materials required for this project.

Heera Redevelopment Project, Phase III at Offshore India

ONGC has awarded Larsen & Toubro Hydrocarbon Engineering an EPICC contract for the 3rd Phase of the Heera Redevelopment project in offshore India. LTHE submitted the lowest bid of USD 187.9 million. The project covers two 12-slot wellhead platforms, approximately 49 km of subsea rigid pipelines. 10 riser installation and modification work at seven existing platforms and the Heera process complex. As a trusted associate of LTHE, we have supplied all the materials required for this project.